Foundations · Structural concrete

Everything above itdepends on this.

The only part of a build nobody can inspect once it is finished. We draw it, dimension it and pour it with our own crew.

  • Licensed & bondedWI CB-000000
  • Self-performedForms, steel and placement
  • $2M general liabilityCertificate on request

The detail

Drawn before it is poured.

This is the section we work from on a typical frost wall. It is also, in order, the sequence the crew builds it in — base, footing, steel, wall, drainage, slab. Scroll to draw it.

The expensive mistakes are all below grade.

A wall that bulges at year six was decided in the first afternoon, in the base and the drainage. That is why our bid has line items your cheapest one does not, and why we would rather lose the job than take those lines out.

Scope

What we take on.

Residential and light commercial. We do not broker crews and we do not take jobs we cannot self-perform.

Laid out from your drawings with control points held through the pour.

Forms braced to the pour rate we actually run, not the one that looks good on paper.

Compacted fill tested at every lift, vapour barrier lapped and sealed.

Tile daylighted or pumped, never simply buried and hoped for.

Assessed honestly — sometimes the answer is a carbon strap, not a rebuild.

Sequence

Drawings to backfill.

  1. 01

    Takeoff

    Quantities off your drawings with every assumption written down where you can see it.

  2. 02

    Layout

    Control points set and verified twice before a form board is cut.

  3. 03

    Pour

    Placement volumes, weather and cylinder breaks recorded the same day.

  4. 04

    Drainage & backfill

    Tile, stone and coatings photographed before anything covers them.

1400+
Foundations poured
19
Years in business
100%
Scope self-performed
2
Callbacks in 2025

Recent

Poured, stripped, backfilled.

Frost walls2025

Ridge Line Townhomes

Eleven units, stepped footings on a six-foot grade change.

Structural slab2025

County Equipment Shop

9,000 sq ft slab designed for a loaded telehandler.

Foundations2024

Lakeshore Residence

Deep frost walls on sand, engineered footing widths throughout.

Foundations2024

Riverbend Clinic

Footings and pads around existing utilities kept live.

What we run

Our own plant.

Nothing on this list is rented on the morning of a pour.

  • Aluminium wall forms to 10 ft
  • Laser level and total station
  • Two line pumps
  • Ride-on power trowel
  • Plate and jumping-jack compactors
  • Skid steer with grading attachment
  • Concrete testing kit
  • Site dewatering pumps

Cylinder breaks run through an independent lab.

Where we pour

Ninety minutes of the yard.

Concrete has a clock on it. We stay inside a radius the trucks can make reliably.

  • Sheboygan
  • Manitowoc
  • Plymouth
  • Kiel
  • Port Washington
  • Fond du Lac
  • Cedarburg

Bid request

Send the drawings.

Plans and a target pour window get you a real number. Square footage alone gets you a guess, and neither of us wants that.

Hours
Mon–Fri, 6:00–16:00
Find us
2200 Yard Road, Sheboygan, WI

Budget numbers given free. Formal bids require drawings.

Send thedrawings.

We will tell you what the sequence really looks like before you award it.